Heat network zoning in England

Your building may be told to connect to a heat network. Here's what that means, in plain English.

I own or manage a building

Offices, hotels, universities, hospitals, leisure and retail.

I work in heat networks

Consultants, developers, ESCOs and operators.

Schematic of a heat network: an energy centre sends hot water along a flow pipe to an office, a hotel, a university building and a block of flats, with a return pipe running back.

Where things stand

  • Pending

    Zoning regulations

    Not yet laid before Parliament

  • Not yet

    Zones designated

    None yet

  • In force

    Ofgem regulation

    Since 27 January 2026

Is your building in a heat network zone?

No zones are formally designated yet. But zoning work is much further on in some places than others. Check a postcode or town against the 28 zoning pilot places and the early zones announced since.

Browse by city

Postcodes are looked up with postcodes.io. We don't store what you type.

What happens if you get a notice

Proposed process
  1. Step 1

    A notice arrives

    Once a zone is designated, the zone coordination body can send a connection notice to buildings in the covered categories.

  2. Step 2

    The 6-month clock starts

    6 months from receiving the notice. In this time you either agree a connection date with the zone developer or apply for a temporary exemption.

  3. Step 3

    Agree a date or seek an exemption

    Negotiate a connection date with the zone developer, or apply for a temporary exemption of up to 2 years from the end of the proposed connection window.

  4. Step 4

    Connect within the window

    The connection window is at least 12 months long. The window can run at the same time as the 6-month agreement phase.

From the government's January 2026 response. Not yet law. Work out your dates

Heat network consultants

Independent listings, written by us from public information. Nobody pays to appear.

All consultants
  • AECOM

    Unconfirmed

    London · London, North West, Yorkshire & the Humber, South West, South East

    Global engineering consultancy that wrote several of the government's zoning pilot reports and co-developed the SWAN scheme in Westminster.

    • Zoning compliance & exemptions
    • Feasibility
    • Procurement support
    • Design & engineering
  • Buro Happold

    Unconfirmed

    Bath · North East, South East, South West

    Engineering consultancy with a place on the government's national heat network zoning framework and three pilot zone reports.

    • Zoning compliance & exemptions
    • Feasibility
    • Design & engineering
  • FairHeat

    Unconfirmed

    London · London, North West

    Heat network specialist focused on existing residential networks, from feasibility and design to performance and regulation readiness.

    • Feasibility
    • Design & engineering
    • Ofgem authorisation
    • Procurement support

Latest update

What we know about HNTAS ahead of its planned 2027 launch

GOV.UK has updated its page on the Heat Network Technical Assurance Scheme. Here is what HNTAS is, where it fits alongside Ofgem regulation and what operators can do now.

All updates

Why this site exists

Zoning will affect thousands of buildings whose owners have never bought heat before. Most of what's written about it is by people with something to sell. This site is independent: not a trade body, not a consultancy, and not connected to DESNZ, Ofgem or any zone developer.

It isn't funded by anyone yet. Listings are free. If we ever charge for featured listings or introductions, they'll be clearly labelled and won't change what we write.

Our editorial policy